Lightweight ,and dimension is precise:
The finished water catch basin is accurate in size, light in weight, reduces the thickness of the material, reduces the cost of transportation, hoisting, excavation and installation, and greatly shortens the installation time.
With smooth surface, it has the look of art, and is easy maintain :
The surface of the polymer concrete water sump pit is not sandy and smooth. According to different needs, different pigments can be added to produce products with different appearance colors, and even surface electroplating can be carried out according to requirements. The surface is not easy to accumulate sediment, easy to rinse without brushing.
On-site processing, easy installation, bonding, drilling and cutting:
Its easy bonding and high water resistance make it easy to machine, drill and cut on site without changing its properties. The finished polymer concrete water catch basin has the advantages of easy construction and convenient installation, which is conducive to shortening and mastering the construction period.
Lightweight ,and dimension is precise:
The finished water catch basin is accurate in size, light in weight, reduces the thickness of the material, reduces the cost of transportation, hoisting, excavation and installation, and greatly shortens the installation time.
With smooth surface, it has the look of art, and is easy maintain :
The surface of the polymer concrete water sump pit is not sandy and smooth. According to different needs, different pigments can be added to produce products with different appearance colors, and even surface electroplating can be carried out according to requirements. The surface is not easy to accumulate sediment, easy to rinse without brushing.
On-site processing, easy installation, bonding, drilling and cutting:
Its easy bonding and high water resistance make it easy to machine, drill and cut on site without changing its properties. The finished polymer concrete water catch basin has the advantages of easy construction and convenient installation, which is conducive to shortening and mastering the construction period.
9 / F, building 1, Ziguang science and Technology Park, Jiangnan Avenue,
Wulong, Fuzhou City, Fujian Province